The Fourth Railway – Ayalon Canal

2022

המסילה הרביעית-תעלת איילון

The fourth track project covers an area of 12,197,142 square meters.

the project's hydrologist,  Dr. Elazar Bamberger of Hydromodule Ltd asked us to build a three-dimensional model of the project area  including a model and route of existing water conduits.

In the process of work we built two models:

An existing condition model in CIVIL-3D in which the two existing water conduits were embedded and a conceptual model current condition in INFRAWORKS.

The models were used to analyze and design the project's drainage system.