The Fourth Railway – Ayalon Canal
2022
The fourth track project covers an area of 12,197,142 square meters.
the project's hydrologist, Dr. Elazar Bamberger of Hydromodule Ltd asked us to build a three-dimensional model of the project area including a model and route of existing water conduits.
In the process of work we built two models:
An existing condition model in CIVIL-3D in which the two existing water conduits were embedded and a conceptual model current condition in INFRAWORKS.
The models were used to analyze and design the project's drainage system.